Live Performance Data — 116 Active Deployments

The floor doesn't lie.
Neither do these numbers.

We walk onto factory floors with clipboards and leave behind connected ecosystems — sensors talking to dashboards, ERPs feeding real-time production schedules.

OEE Dashboard — Uptime Network
May 30, 2026 · LIVE
0%
Average OEE Improvement
0 Mo
Average Payback Period
$0M
Median Annual Savings
0
Plants Transformed
Book Your Plant AssessmentNo email gate · 45-min discovery session
Scroll
The Floor Before Uptime

You're managing a factory
with 1990s visibility.

Every plant manager we've met knows exactly where the pain is. The problem isn't awareness — it's that the data to act on it doesn't exist in real time.

01

The Whiteboard Photo

Your shift supervisor texts you a blurry photo of a whiteboard at 6:43 AM. That's your production data.

94%of mid-market plants still rely on manual data entry
02

The Spindle Drift

A $40,000 scrap event that started as a 2% spindle speed drift at 11 PM — caught at 6 AM when second shift pulled the parts.

6.2 hrsaverage detection lag on process drift events
03

The Spreadsheet ERP

Your ERP has data. Your MES has data. Neither talks to the other. So your scheduler works from a spreadsheet that's wrong by noon.

3 systemsaverage siloed data sources per production line
04

The Downtime Mystery

You know you lost 4 hours on Line 3 last Tuesday. You don't know if it was changeover, breakdown, or idle wait — and neither does anyone else.

18%of production hours lost to unclassified downtime
The Engagement Arc — No Black Box

Exactly what you're buying.
Phase by phase.

Manufacturing leaders have been burned by consultants who disappear after the deck. Every phase below is a fixed contract with defined deliverables, your time commitment, and measurable exit criteria before we advance.

PHASE 015 Business Days

Discovery Audit

"We read the floor before we touch a single wire."

What We Do

Two Uptime engineers spend two days on-site walking every production line, interviewing shift supervisors, and mapping every data handoff — from sensor to spreadsheet to ERP. We leave with a complete Current State Map and a ranked list of the 8–12 highest-value instrumentation points on your floor.

Deliverables
  • Current State Data Flow Map (PDF + editable Miro)
  • Ranked Instrumentation Opportunity Matrix
  • Preliminary ROI model with conservative/base/upside scenarios
  • Architecture options brief (3 options, vendor-agnostic)
Your Time Investment

4–6 hours of plant manager and supervisor time across 2 days. No preparation required beyond badge access and a willing shift supervisor.

Exit Criteria

Signed-off Current State Map. Client agrees on top 3 pilot line candidates before Phase 2 begins.

PHASE 0210 Business Days

Architecture Blueprint

"The exact stack, the exact cost, before a single dollar is spent."

What We Do

We design the full technical architecture — sensor types, edge hardware, connectivity protocol, historian, dashboard layer, and ERP integration touchpoints — for both the pilot line and the eventual full deployment. Every component is specified with three vendor options and a total landed cost.

Deliverables
  • Full technical architecture document (sensor → cloud → dashboard)
  • Bill of materials with three vendor options per component
  • Network and cybersecurity requirements brief
  • Integration spec for your ERP (SAP, Oracle, Epicor, or custom)
  • Implementation timeline with Gantt chart
Your Time Investment

2 working sessions (2 hours each) with your IT lead and one operations manager. Remote.

Exit Criteria

Architecture signed off by client IT and operations. Pilot line and sensor points agreed. Purchase orders issued for pilot hardware.

PHASE 0321 Days

Pilot Line

"One line. Twelve sensors. Your first live OEE dashboard."

What We Do

We instrument one production line with 12–18 IoT sensors, stand up your edge infrastructure, configure your historian, and build your first live OEE dashboard — all in 21 calendar days. By day 22, your plant manager is watching real-time availability, performance, and quality on a screen that refreshes every 15 seconds.

Deliverables
  • 12–18 sensors installed and calibrated on Pilot Line
  • Edge gateway configured and secured
  • Live OEE dashboard (availability · performance · quality)
  • Downtime classification taxonomy (your categories, your language)
  • Operator and supervisor training (2 hours)
  • 30-day anomaly baseline established
Your Time Investment

1 maintenance window (4–6 hours, off-shift) for sensor installation. Daily 15-minute check-in with Uptime PM during 21-day sprint.

Exit Criteria

Pilot line OEE visible in real time. Client operations team independently using dashboard for 5 consecutive days before Phase 4 begins.

PHASE 0460–120 Days

Full Deployment

"Every line. Every shift. Every number."

What We Do

We replicate the pilot architecture across all remaining production lines, integrate your ERP for real-time scheduling feedback, and stand up your plant-level command center. Deployment is phased by line priority — highest-value lines first — so you're generating ROI throughout the rollout, not waiting for day 120.

Deliverables
  • Full plant sensor network (all lines)
  • ERP integration (real-time production schedule → dashboard)
  • Plant-level OEE command center dashboard
  • Shift supervisor mobile app (tablet-optimized)
  • Automated scrap and downtime reporting
  • Custom alert rules per line and machine
  • Full operator and maintenance team training
Your Time Investment

One maintenance window per line (4–6 hours each). Weekly 30-minute project review with Uptime PM.

Exit Criteria

All lines live. ERP integration validated. Plant manager independently running weekly OEE review from dashboard. Baseline OEE delta documented.

PHASE 05Ongoing · Monthly Retainer

Continuous Optimization

"The dashboard is the beginning, not the deliverable."

What We Do

Most consultants leave after go-live. We stay. Monthly, our engineers review your OEE trends, identify emerging drift patterns, update alert thresholds as your process evolves, and bring you one new optimization recommendation based on your actual data — not generic best practices.

Deliverables
  • Monthly OEE trend review and written analysis
  • Alert threshold tuning as process baselines shift
  • One actionable optimization recommendation per month
  • Quarterly architecture review (new lines, new machines)
  • Priority support SLA (4-hour response on critical alerts)
Your Time Investment

1-hour monthly review meeting with operations manager. Everything else is Uptime-driven.

Exit Criteria

No fixed end. Clients typically see 8–14% additional OEE improvement in the 12 months following full deployment through continuous optimization alone.

Plant Managers · Real Numbers

The floor doesn't care
about slide decks.

Every number below is from a signed client. We don't round up. We don't cherry-pick. These are median outcomes across plant type and size.

"
We were texting whiteboard photos to the plant manager at 5 AM. Now he has a dashboard on his phone that refreshes every 15 seconds. We found a spindle drift pattern on Line 4 in week two that would have cost us $180,000 in a single month. Uptime paid for itself before the pilot was even done.
Marcus Delgado, VP of Operations at Rexford Precision Components
Marcus Delgado
VP of Operations · Rexford Precision Components
Discrete manufacturer · 8 production lines · 340 employees
+31% OEE
OEE Lift
3.1 month payback
ROI Period
"
I've seen a lot of consultants come through this plant. Most leave behind a binder. Uptime left behind a working system. My shift supervisors stopped arguing about downtime codes because the data is right there. We cut unplanned downtime by 44% in six months.
Theresa Kwon, Plant Manager at Meridian Fluid Systems
Theresa Kwon
Plant Manager · Meridian Fluid Systems
Process manufacturer · 4 production lines · 210 employees',
+28% OEE
OEE Lift
4.8 month payback
ROI Period
"
The transparency in their process is what sold me. Before we signed, I knew exactly what we were buying, what it would cost my team in time, and what the exit criteria were for each phase. No surprises. The pilot was live in 19 days — two days ahead of schedule.
Robert Okafor, Director of Manufacturing at Lakeside Industrial Castings
Robert Okafor
Director of Manufacturing · Lakeside Industrial Castings
Hybrid manufacturer · 12 production lines · 580 employees
+42% OEE
OEE Lift
3.8 month payback
ROI Period
Questions from the Floor

The objections every
plant manager carries.

Minimal. Phase 1 requires 4–6 hours of your plant manager and one shift supervisor across two days. We shadow — we don't stop production. Sensor installation in Phase 3 requires one off-shift maintenance window of 4–6 hours per line. We've done this in active 24/7 plants without a single unplanned minute of downtime.

ERPs record what happened. Our system shows what's happening right now. The typical integration we build feeds your ERP's production schedule back into the dashboard so schedulers see actual vs. planned in real time — and can adjust before the shift ends, not after the week-end report.

Our contracts include a defined improvement threshold for the pilot line. If we don't hit it by the end of Phase 3, you don't advance to Phase 4 and we refund the Phase 3 fee. The exit criteria are written into the contract before Phase 1 begins — not decided retroactively.

Both. If you have existing sensors, we audit them in Phase 1 and integrate what's reliable. Most plants have 20–40% usable existing instrumentation. We fill the gaps. We're vendor-agnostic — we've integrated with Siemens, Rockwell, Ignition, and custom PLCs.

It depends on plant size, existing infrastructure, and ERP complexity. Our Phase 1 audit produces a full cost model with conservative/base/upside scenarios before you commit to Phase 2. The median full deployment for a 6–10 line plant runs $280,000–$420,000 all-in, with a 4.2-month median payback.

Most clients identify their first actionable cost-saving insight within the 21-day pilot — before full deployment begins. The median payback across our 116 deployments is 4.2 months from Phase 3 go-live. The fastest was 6 weeks (a scrap reduction event on the pilot line that paid for the entire engagement).

Book Your Plant Assessment

Three fields.
One conversation that changes the floor.

No email gate. No PDF bait. You've seen the entire methodology — the only remaining question is when. We'll confirm within 4 business hours.

Assessment Request Form
~3 min to complete

Determines which sensor types and integration patterns we'll focus on during the audit.

8
1 line50+ lines

We'll scope the pilot to one line regardless of total count. This helps us size the full deployment estimate.

Two Uptime engineers on-site for 2 days. We'll confirm availability and send a calendar invite within 4 business hours.

No commitment · 45-min discovery call · Confirmed in 4 hours